When planning an ADU’s utility connections, you’ll need to address four core systems: water, electrical, sewer, and gas. You’ll have to determine whether to tap into your main home’s existing utilities or establish separate connections to municipal services. Water supply requires proper pipe sizing and shut-off valves, while electrical needs minimum 100-amp service for most units. Sewer options include connecting to the main home’s line or installing a separate septic system. Gas connections demand careful load calculations and safety measures. Each utility requires specific permits and must meet local regulations. Understanding these technical requirements will set the foundation for a successful ADU project.

Water Supply and Plumbing Systems

Properly connecting an ADU’s water supply requires careful planning and compliance with local plumbing codes. You’ll need to determine whether you’ll tap into your main home’s existing water line or establish a separate connection to the municipal water supply. The decision often depends on your local regulations, property layout, and water pressure requirements.

Your ADU’s plumbing system must include properly sized supply lines, typically 3/4-inch or 1-inch diameter pipes, to guarantee adequate water pressure. You’ll need to install shut-off valves at key points, including the main connection and before each fixture. The system should incorporate pressure-reducing valves if your municipal water pressure exceeds 80 psi.

Consider installing a sub-meter to track the ADU’s water usage separately, which can be essential for rental situations. You’ll also need to guarantee proper pipe insulation to prevent freezing in cold climates and maintain energy efficiency. The drainage system must include appropriate venting, trap primers for floor drains, and cleanouts for maintenance access. Don’t forget to slope drain lines at a minimum of 1/4 inch per foot to ensure proper waste flow and prevent backups.

ADU home interior with utility connections

Electrical Service Requirements

Three key factors determine your ADU’s electrical service requirements: total square footage, anticipated power usage, and local building codes. You’ll need to calculate your expected electrical load based on major appliances, HVAC systems, and general lighting requirements. Most ADUs require a minimum 100-amp electrical service, though some jurisdictions may allow 60-amp service for units under 500 square feet.

You’ll need to decide between establishing a separate electrical meter or connecting to your main home’s existing service. If you’re planning to rent your ADU, a separate meter allows for independent utility billing. The connection method must comply with National Electrical Code (NEC) standards and local regulations.

Your electrical panel should include dedicated circuits for major appliances: 240V circuits for electric ranges, dryers, and HVAC equipment, plus 120V circuits for general outlets and lighting. You’ll need GFCI protection in wet areas like kitchens and bathrooms. The panel must be readily accessible and properly grounded according to code requirements.

Consider future power needs when sizing your service. Installing additional capacity now costs less than upgrading later, especially if you’re planning to add electric vehicle charging or additional appliances.

Sewer Connection Options

Connecting your ADU to a sewer system typically involves three main options: tying into the main home’s existing sewer line, installing a direct connection to the municipal sewer, or implementing an independent septic system.

If you’re connecting to the main home’s sewer line, you’ll need to locate the existing line, determine its capacity, and install a new branch line with the proper slope (typically 1/4 inch per foot). You’ll also need to install a two-way cleanout at the connection point to facilitate maintenance.

Direct municipal connections require permits, extensive excavation, and coordination with local utilities. You’ll need to tap into the main sewer line in the street, which often involves hiring a licensed contractor and paying substantial connection fees.

For properties where municipal sewer access isn’t available, a septic system becomes necessary. This option requires a percolation test, adequate land for the leach field, and compliance with local health department regulations. You’ll need to calculate the system’s capacity based on the ADU’s bedroom count and anticipated water usage. The septic tank must be sized appropriately, typically requiring a minimum 750-gallon capacity for a one-bedroom ADU.

Gas Line Considerations

Installing gas lines for your ADU brings up pivotal safety and compliance requirements that differ based on your local codes and intended gas appliances. You’ll need to determine if you’ll tap into your main home’s existing gas line or require a separate meter installation. For most ADUs, extending the main home’s gas line proves more cost-effective, but you must guarantee the existing line can handle the additional load.

Your gas line sizing depends on several factors: the number of gas appliances you’ll install, their BTU requirements, and the distance from the main connection. You’ll need to calculate the total gas load to determine proper pipe dimensions and pressure requirements. Standard appliances like water heaters typically require 3/4-inch lines, while smaller appliances may only need 1/2-inch connections.

Always work with a licensed plumber who’ll obtain necessary permits and conduct pressure tests. They’ll guarantee proper installation of shut-off valves, appropriate pipe materials (black iron or corrugated stainless steel tubing), and required venting systems. You’ll also need inspection clearance before activating any gas connections, and your contractor should provide documentation of load calculations and system specifications.

ADU house with utility connections

Permits and Local Regulations

Local regulations governing ADU utility connections vary noticeably between jurisdictions and require careful navigation of multiple permit requirements. You’ll need to obtain specific permits for each utility connection, including electrical, plumbing, and gas services. Most municipalities require detailed site plans showing proposed utility routes and connection points before issuing these permits.

Before starting any utility work, you must submit your plans to the local building department for review. You’ll typically need to include load calculations, connection specifications, and documentation of existing utility capacities. Many jurisdictions also require inspection reports from utility companies confirming adequate service availability for your ADU.

The permitting process often involves multiple departments, including planning, building safety, and public works. You’ll need to coordinate with each department’s timeline and requirements. Some areas mandate professional engineers’ stamps on utility plans, while others require licensed contractors to file permit applications. Check your local codes for specific requirements about utility separation distances, meter placement, and backflow prevention devices. Don’t forget to verify if your jurisdiction requires separate meters for the ADU or allows shared connections with the primary residence.

Building a Foundation for Long-Term Efficiency and Success

Planning your ADU’s utility connections isn’t a walk in the park – it’s a complex web of interconnected systems that demand your careful attention. You’ll need to methodically evaluate water, electrical, sewer, and gas requirements while traversing local regulations and permit processes. By understanding these technical aspects and following proper protocols, you’re ensuring your ADU project meets code requirements and functions efficiently for years to come.